Skip to main content
Merbau deck towards two-storey house, wire balustrade
Merbau deck towards two-storey house, wire balustrade, Wahroonga

Licensed carpenter · Sydney

Deck builders in Sydney

We build new decks and rebuild tired ones in timber and composite, from small courtyard decks to raised decks on sloping bush blocks, across Sydney.

Trex, since 2024
TrexPro® partner
Licensed
Since 2014

Preferred installer for the boards we build with

About decking

Most of our work is decks.

We build them new, rebuild them when the frame has gone, and re-board them when the frame is still sound. Recent jobs include a curved two-level composite deck built around trees in North Ryde, a raised two-level merbau deck with a wire balustrade on a sloping bush block in Wahroonga, and a composite deck down a narrow side passage in Ashfield.

We build in merbau and other hardwoods, treated pine and composite boards. We explain what each looks like after a few years, the upkeep it needs and how it suits your site, then quote the material you choose. If an existing deck can be saved, we say so.

Covered deck with L-shaped floating bench along sandstone wall
Covered deck with L-shaped floating bench along sandstone wall, Hunters Hill

Deck designer

Design your deck

Choose the kind of deck, the boards and the colour. We bring real boards to the measure, and your choices go straight into your quote request.

Platform and lower deck levels
Our work · Two-level composite deck with a curved edge, North Ryde

Board sample
Trex Spiced Rum

Screen colours are a guide. We bring real boards to the measure.

01Type of deckLevels that follow a gentle fall, or a curved edge around trees and lawn.
02Boards
Looks
Wood fibre and plastic with a hard outer shell. Holds its colour far longer than bare timber.
Upkeep
A wash now and then. No oiling, and no splinters.
Good to know
Dark boards get hot in full afternoon sun, and a deep scratch can’t be sanded out.
03Colour and finish

Trex Transcend colours. We have also built with NewTechWood, Eva Last, Modelo and Dura Life, and can show you boards from each.

Your deckTwo levels or curves · Composite · Trex Spiced Rum

Before we price it

What changes a deck job

New raised merbau deck across rear of rendered house with boxed stair, bare dirt yard
Lane Cove · raised merbau deck with a boxed stair
  1. Height and slope

    The higher a deck sits, the more it needs: deeper footings, bracing, a balustrade and often stairs. A steep block can mean two levels instead of one.

  2. Access

    Timber, boards and footing materials all have to reach the backyard. A narrow side path or a long carry adds time to the job.

  3. Approval

    Many low decks in NSW are exempt development. Higher or larger decks, and decks on heritage-listed or bush fire prone lots, usually need approval.

  4. Material and upkeep

    Timber needs oil or stain to keep its colour; composite needs a wash. Composite makers also set their own joist spacing, which can be closer than for timber.

  5. What is already there

    Old decks hide problems: rotten joists, posts sitting in wet soil, or a frame fixed straight to weatherboards. We look for these before we quote, not halfway through.

Our work

More decking we’ve built

Each job with its suburb and what we built. Open one for the full set of photos.

What customers say on Google

Google rating

5.0

From 33 reviews on Google

Read all 33 reviews on Google

“The boys nailed it! Built my deck out of engineered timber and the quality of work was fantastic. Job was done quick, site was left clean, etc. Would recommend!”

Greg Hamer5 out of 5,Google ·
  • “I've found my new carpenter! Haz did a fabulous job of doing all new balustrading on my back deck. He was very precise with his fitting and measurements and also went out of his way to help me with 2 other little jobs I needed to do before selling my house. What he did for me was a tremendous help and I'm so grateful. Look no further than Haz. He is the kindest and the best!”

    Sarah FGoogle ·
  • “I would recommend Timbaland to my friends, and would try to get them again if work later comes up. We got them to do our backyard deck. And Haz has been professional and easy to deal with from the beginning. He explains the work and his pricing really well. He’s efficient and his quality of work is very commendable. Extremely happy with their work.”

    Divina Dela CruzGoogle ·
  • “Timberland were very professional and did a superb job on our new deck. Their attention to detail was amazing providing an outstanding result. The tradesmen were highly skilled and took pride in their work. They are reliable and finished the job ahead of time and on budget.”

    Jeni PattisonGoogle ·

How a job runs

How a deck job runs

  1. Step 01

    Send photos and a rough size

    A few photos of the area and roughly how big you want the deck help us understand the job before we visit.

  2. Step 02

    We measure and look at the site

    We check levels, the fall of the block, access and drainage, and talk through boards and finishes with you on site.

  3. Step 03

    A clear written quote

    The quote sets out what we will build, in what material, and what is and isn't included, so nothing comes as a surprise later.

  4. Step 04

    Approval checked

    We tell you whether the deck fits the exempt development rules or needs approval before you commit.

  5. Step 05

    Footings, frame and boards

    We set out the footings, build the subframe, then lay the boards, steps and balustrade, keeping the site tidy as we go.

Approval check

Does my deck need council approval?

Many low decks in NSW are exempt development. Answer nine questions to see where yours is likely to stand.

  1. 01Will it sit behind the front of the house?It has to be behind the building line of any road frontage.
  2. 02Will the floor be 1 m or less above the ground at every point?On a sloping block, measure at the high end.
  3. 03Will it be 3 m or less high at its highest point?Measured from the existing ground level.
  4. 04Will any wall enclosing it be 1.4 m high or less?Answer yes if it is open on every side.
  5. 05Will it be at least 900 mm from the side and rear boundaries?The distance for most suburban blocks.
  6. 06Is the block outside the rural and R5 large-lot residential zones?In those zones it has to be 5 m from the boundaries. Your council’s planning certificate shows the zone.
  7. 07Will it be 25 m² or smaller?For example, 5 m by 5 m.
  8. 08Counting any decks, patios and pergolas already there, will the total stay within the limit?On a block over 300 m², 15% of the house’s ground floor area. On a block of 300 m² or less, 25 m².
  9. 09Is the property free of heritage listing and bush fire mapping?Your council’s planning certificate shows both.

0 of 9 answered

Answer each question

The result updates as you go.

Based on the NSW Government fact sheet on exempt development for decks and pergolas (2022). A guide only, not legal advice. Read the fact sheet

Questions

What customers ask us

Can you re-board my deck instead of rebuilding it?

Often, yes. If the bearers, joists and footings are sound and the frame is level, new boards can go straight on. We test the frame when we measure. If some parts are rotten we replace just those where we can, and tell you plainly if the whole frame needs to go.

Should I choose timber or composite?

It comes down to look, feel and upkeep. Timber feels natural underfoot and can be sanded back, but it needs oiling to hold its colour. Composite keeps its colour with a wash and no oil, but darker boards get hot in full sun. We bring boards to look at on site and talk it through with you.

Can you build on a steep or bushy block?

Yes. Several of our decks are on sloping bush blocks, including Wahroonga and Beecroft. A steep site may need deeper footings, two levels or stairs. If the land is mapped as bush fire prone, the approval path and construction rules change, so we check the map early.

Do you build the stairs and balustrade with the deck?

Yes. Steps, landings, stairs and balustrades are part of the deck job, so they are designed and framed together rather than added on at the end.

Regions we work in

We build across these parts of Sydney. Open your region to find your suburb.

Ryde AreaNorth ShoreHills DistrictInner WestNorthern BeachesSydney CityEastern SuburbsRydeAreaNorthShoreHillsDistrictInnerWestNorthernBeachesSydneyCityEasternSuburbs1234567
Map adapted from suburb boundaries © State of New South Wales (Spatial Services, a business unit of the Department of Customer Service NSW), CC BY 4.0

Planning a deck? Tell us about it

A few details and a photo or two of the area are enough to start. We'll be in touch to talk it through.