
Deck builders in Sydney
We build new decks and rebuild tired ones in timber and composite, from small courtyard decks to raised decks on sloping bush blocks, across Sydney.
- New decks, rebuilds and re-boarding
- Timber, hardwood and composite boards
- Raised decks on sloping blocks
- NSW contractor licence276621CCarpenter, held since 2014Check the register
- QuotesFree, on siteMonday to Saturday, from 7am
- Preferred installer for
About decking
New decks, rebuilds and re-boards
We build new decks, rebuild decks whose frame has gone and re-board decks whose frame is still sound. If an existing deck can be saved, we say so.
We build in merbau and other hardwoods, treated pine and composite boards. We explain what each looks like after a few years, the upkeep it needs and how it suits your site, then quote the material you choose.
The frame is where a deck lasts or fails, so we set it out for the boards you pick: joists spaced to the board's guide, timber rated for where it sits, kept clear of wet ground, and fixings that suit the boards. Raised decks, stairs and balustrades are built to the building code, and higher decks may need approval, so we plan that with the deck.

Choose your decking
- 01
Composite decking
Boards that keep their colour without oiling, on a frame set out to the board maker's guide.
- 02
Timber decking
Treated pine and hardwood decks, built and finished for Sydney weather.
- 03
Hardwood decking
Spotted gum, blackbutt, ironbark and other hardwoods: how each looks, wears and is cared for.
- 04
Merbau decking
A dense, reddish-brown hardwood and the timber we build with most.
- 05
Trex decking
A capped composite board that keeps its colour without oiling, on a frame set out to the Trex guide.
- 06
Pool decking
Timber and composite decks around pools and spas, built so the boards drain.
Deck designer
Design your deck
Choose the kind of deck, the boards and the colour. We bring real boards to the measure, and your choices go straight into your quote request.

Board sample
Trex Spiced Rum
Screen colours are a guide. We bring real boards to the measure.
See our curved two-level deck in North RydeYour deckTwo levels or curves · Composite · Trex Spiced Rum
Before we price it
What changes a deck job

Height and slope
The higher a deck sits, the more it needs: deeper footings, bracing, a balustrade and often stairs. A steep block can mean two levels instead of one.
Access
Timber, boards and footing materials all have to reach the backyard. A narrow side path or a long carry adds time to the job.
Approval
Many low decks in NSW are exempt development. Higher or larger decks, and decks on heritage-listed or bush fire prone lots, usually need approval.
Material and upkeep
Timber needs oil or stain to keep its colour; composite needs a wash. Composite makers also set their own joist spacing, which can be closer than for timber.
What is already there
Old decks hide problems: rotten joists, posts sitting in wet soil, or a frame fixed straight to weatherboards. We look for these before we quote, not halfway through.
Typical prices
Typical deck prices in Sydney
Our typical prices per square metre for a deck up to a metre off the ground, with its footings and frame. Supplied and installed, including GST. Checked October 2026. Your written quote after the measure gives the price for your job.
- Treated pine
- $205–$400per m²
- Merbau
- $345–$630per m²
- Spotted gum
- $400–$690per m²
- Composite, including Trex
- $320–$805per m²
What the prices cover
- Footings, bearers and joists for a deck up to a metre high
- The boards, fixings and fascia
- Labour and clearing up the site
Priced separately
- Raised or high-set frame: $57–$205 per m² extra
- A flight of stairs: $1,150–$5,200 per flight
- Balustrade: $170–$520 per metre
- Removing an old deck: $23–$63 per m²
- Oiling or staining a timber deck
- Council or certifier fees, where approval is needed
A typical job
A 20 m² merbau deck close to the ground, on a flat yard with easy access, comes to about $6,900–$12,600. Add a flight of stairs and it is about $8,050–$17,800.
On video
How a deck goes together
The frame goes in first, steel, aluminium or timber depending on what sits underneath, then the boards go down over it. Clips filmed on our jobs, no sound.
Bellevue HillSpotted gum boards on a DeckTek steel frame North RydePool deck in Eva-Last Pioneer, frame to finish Nathan’s Lawns and GardensAluminium frame, then TimberTech boards, in his own backyard With Clever Craft CarpentryRooftop decks in Ekodeck on a Clickdeck aluminium frame
Our work
More decking we’ve built
Each job with its suburb and what we built. Open one for the full set of photos.
What customers say on Google
Google rating
5.0
From 33 reviews on Google
“The boys nailed it! Built my deck out of engineered timber and the quality of work was fantastic. Job was done quick, site was left clean, etc. Would recommend!”
From the trade
What the brands and trades say
What board makers, suppliers and other trades have said on Instagram posts of our jobs, kept apart from our Google reviews. Each links to the post it was left on.
Nathan’s Lawns and Gardens
Absolute best in the business
Nathan Stafford, the landscaper who cleans up yards for free, followed by millions on Instagram
On the TimberTech deck we built in his own backyard · Apr 2025See the post
Dane Kearns
Blackbutt Natural looks beautiful. Nice install as usual, Haz.
National Product Manager, ITI Australia (Eva-Last)
On our Eva-Last Pioneer deck in Lane Cove North · Nov 2024See the post
Trex by Hurford’s
A stunner!
The Australian and New Zealand distributor of Trex
On our Trex Transcend deck in Birchgrove · May 2024See the post
Rob Benton
How good was this!!! Can’t wait to see the next project!
TimberTech, Australia, New Zealand and the Pacific
On a deck build we filmed · May 2025See the post
NewTechWood Australia
Great job guys!
Composite decking, cladding and screening
On our NewTechWood deck in Dundas Valley · Nov 2023See the post
Clever Craft Carpentry
Great work, great experience working with this team
Sydney decking and pergola builders
On the rooftop and common-area decks we built together · Sep 2026See the post
From first message to finished job
How a deck job runs
Four steps, and you know the price before anything starts.
Step 01
Send us the details
Use the form or call. A few lines and a photo or two of the area are enough to start.
Step 02
We call you back
Usually within one working day. We talk through what you want and arrange a time to look at the site.
Step 03
We measure on site
Usually within a week of the call. We check the block, the access and the drainage, and suggest the materials and layout that suit.
Step 04
Haz quotes, then we build
Your written quote follows within a few working days. Once you are happy with it, Haz and his crew build it and leave the site tidy.
Approval check
Does my deck need council approval?
Many low decks in NSW are exempt development. Answer nine questions to see where yours is likely to stand.
- 01Will it sit behind the front of the house?It has to be behind the building line of any road frontage.
- 02Will the floor be 1 m or less above the ground at every point?On a sloping block, measure at the high end.
- 03Will it be 3 m or less high at its highest point?Measured from the existing ground level.
- 04Will any wall enclosing it be 1.4 m high or less?Answer yes if it is open on every side.
- 05Will it be at least 900 mm from the side and rear boundaries?The distance for most suburban blocks.
- 06Is the block outside the rural and R5 large-lot residential zones?In those zones it has to be 5 m from the boundaries. Your council’s planning certificate shows the zone.
- 07Will it be 25 m² or smaller?For example, 5 m by 5 m.
- 08Counting any decks, patios and pergolas already there, will the total stay within the limit?On a block over 300 m², 15% of the house’s ground floor area. On a block of 300 m² or less, 25 m².
- 09Is the property free of heritage listing and bush fire mapping?Your council’s planning certificate shows both.
Based on the NSW Government fact sheet on exempt development for decks and pergolas (2022). A guide only, not legal advice. Read the fact sheet
Can you re-board my deck instead of rebuilding it?
Often, yes. If the bearers, joists and footings are sound and the frame is level, new boards can go straight on. We test the frame when we measure. If some parts are rotten we replace just those where we can, and tell you plainly if the whole frame needs to go.
Should I choose timber or composite?
It comes down to look, feel and upkeep. Timber feels natural underfoot and can be sanded back, but it needs oiling to hold its colour. Composite keeps its colour with a wash and no oil, but darker boards get hot in full sun. We bring boards to look at on site and talk it through with you.
Can you build on a steep or bushy block?
Yes. Several of our decks are on sloping bush blocks, including Wahroonga and Beecroft. A steep site may need deeper footings, two levels or stairs. If the land is mapped as bush fire prone, the approval path and construction rules change, so we check the map early.
Do you build the stairs and balustrade with the deck?
Yes. Steps, landings, stairs and balustrades are part of the deck job, so they are designed and framed together rather than added on at the end.
What does a deck quote include?
The footings, bearers and joists, the boards, fixings and fascia, the labour and clearing up the site, supplied and installed, including GST. Stairs, a balustrade, a raised frame and taking out an old deck are priced on top, and your written quote after the measure lists the ones your deck needs. Oiling a timber deck and any council or certifier fees are separate.
Why do deck quotes differ so much?
Mostly because they price different decks. The board, the height off the ground, the footings a slope needs, stairs and balustrades, and taking out the old deck all move the price. To compare quotes, check each one is for the same board, the same area and height, the same extras, and says whether GST is included.
How long does a deck take to build?
A typical 20 m² timber deck about a metre off the ground takes about a week on site, weather permitting. A bigger or higher deck, a sloping block or tight access takes longer, and where the deck needs council approval, that comes first. Your written quote gives the timing for your deck.
Regions we work in
We build across these parts of Sydney. Open your region to find your suburb.
Northern Beaches38 suburbs
Sydney City20 suburbs
Eastern Suburbs40 suburbs
Keep looking
Related services and guides

Planning a deck? Tell us about it
A few details and a photo or two of the area are enough to start. We'll be in touch to talk it through.
- Google reviews
- 5.0 from 33
- NSW licence
- 276621C · Carpenter
- Quotes
- Free, on site
- Licensed
- Since 2014















